Changes for page [REAKT] Project REAKTOR
Last modified by Alexander Schulz-Rosengarten on 2024/10/09 15:19
<
>
edited by Alexander Schulz-Rosengarten
on 2024/09/12 10:08
on 2024/09/12 10:08
edited by Alexander Schulz-Rosengarten
on 2024/09/19 13:51
on 2024/09/19 13:51
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Parent
-
... ... @@ -1,1 +1,1 @@ 1 -Theses. Current Theses.WebHome1 +Theses.Topics for Student Theses.WebHome - Content
-
... ... @@ -18,7 +18,7 @@ 18 18 * Provisions for passenger transfer on open track ("Begegnungsverkehr", see concept art [[here>>https://cloud.rz.uni-kiel.de/index.php/s/ZMZSoLTerJCJi7L]]) 19 19 * The inter train communication concept maybe based on a central or decentralized structure 20 20 21 -2. An autonomous train controller with risk analysis using STPA 21 +2. An autonomous train controller with risk analysis using STPA **[already reserved]** 22 22 23 23 * Control of an autonomous passenger train model (conceptually working for both demonstrators) 24 24 * Capability for passenger transfer on open track (safe docking procedure; "Begegnungsverkehr", see concept art [[here>>https://cloud.rz.uni-kiel.de/index.php/s/ZMZSoLTerJCJi7L]]) ... ... @@ -26,17 +26,28 @@ 26 26 * Safe behavior model generation using PASTA ([[https:~~/~~/marketplace.visualstudio.com/items?itemName=kieler.pasta>>https://marketplace.visualstudio.com/items?itemName=kieler.pasta]]) 27 27 * Assumes preprocessed sensor input and destination determination (see other topics) 28 28 29 -3. AI-based imagerecognition for autonomous train control29 +3. AI-based obstacle detection for autonomous train control using image recognition 30 30 // This topic will be jointly advised with the AG Distributed Systems// 31 31 32 -* Sensor processing of a train mounted camera 33 -* Obstacle detection at speeds up to 50 km/h 32 +* Sensor processing of a train mounted camera to detect objects (potential obstacles) 33 +* Tasks will involve: 34 +** Sensor mounting on the demonstrator 35 +** Collection of data (images, videos) 36 +** Labeling of data to enable training (esp. for small scale model) 37 +** Training of AI 38 +** Evaluation of quality 39 +** Live testing 40 +* Step-wise evaluation of the influence of vehicle speed on the detection quality 41 +* Evaluate the 42 +* (Optional) Trajectory detection to categorize safety threads of moving obstacles 43 +* (Optional) Evaluate performance on different hardware, e.g. Rasberry Pi vs. AI hardware 44 +* (Optional) Test and evaluate on the edge deployment 45 +* For interfacing with the controller the sensor should provide an assessment how safe the 34 34 * Potential hardware (subject to changes): 35 35 ** [[https:~~/~~/www.raspberrypi.com/documentation/accessories/camera.html>>https://www.raspberrypi.com/documentation/accessories/camera.html]] 36 36 ** ((( 37 -https:~/~/www.axis.com/de-de/products/axis-p1455-le 49 +[[https:~~/~~/www.axis.com/de-de/products/axis-p1455-le>>https://www.axis.com/de-de/products/axis-p1455-le]] 38 38 ))) 39 -* [Optional] Distance measuring using multiple cameras 40 40 41 41 4. AI-based sensor processing for autonomous train control 42 42 // This topic will be jointly advised with the AG Distributed Systems// ... ... @@ -46,13 +46,13 @@ 46 46 ** [[https:~~/~~/www.elektronik-kompendium.de/sites/praxis/bauteil_ultrasonic-hcsr04p.htm>>https://www.elektronik-kompendium.de/sites/praxis/bauteil_ultrasonic-hcsr04p.htm]] 47 47 ** [[https:~~/~~/www.pi-shop.ch/lidar-ld06-lidar-module-with-bracket-entwicklungskit-fuer-raspberry-pi-sbc>>https://www.pi-shop.ch/lidar-ld06-lidar-module-with-bracket-entwicklungskit-fuer-raspberry-pi-sbc]] 48 48 ** ((( 49 -https:~/~/www.blickfeld.com/de/produkte/cube-1/ 60 +[[https:~~/~~/www.blickfeld.com/de/produkte/cube-1/>>https://www.blickfeld.com/de/produkte/cube-1/]] 50 50 ))) 51 51 * Obstacle detection at speeds up to 50 km/h 52 52 * Distance measuring (ultrasonic sensor) 53 53 54 -5. A digital twin for an autonomous on-demand train service 55 - 65 +5. A digital twin for an autonomous on-demand train service **[already reserved]** 66 +// Note: Tight interfacing with other topics// 56 56 57 57 * A digital twin for an autonomous passenger train 58 58 * Monitoring system for the state and location of the vehicle ... ... @@ -60,6 +60,19 @@ 60 60 * Monitoring and economic analysis of on-demand service operation (//integration/interfacing of management system//) 61 61 * Reliability analysis/statistics to ensure transparency of autonomous operation 62 62 74 +6. A standalone sensor box for monitoring rail vehicles 75 + //This prototype will be tested (only) using the full-scale demonstrator and is intended for monitoring non-autonomous vehicles (not the REAKTOR)// 76 + 77 +* Development of a sensor array to monitor rail vehicle operation 78 +* It should serve as a plugin solution inside the train's cockpit for monitoring operation and as preparation for autonomous control 79 +* Design for wireless communication of collected data 80 +* Possible sensors: 81 +** GPS 82 +** Accelerometer 83 +** Camera 84 +* Analysis of data for autonomous driving 85 +* Potential integration into digital twin infrastructure 86 + 63 63 == Goals == 64 64 65 65 * TBA for each topic individually