Changes for page [REAKT] Project REAKTOR
Last modified by Alexander Schulz-Rosengarten on 2024/10/09 15:19
<
>
edited by Alexander Schulz-Rosengarten
on 2024/09/10 13:27
on 2024/09/10 13:27
edited by Alexander Schulz-Rosengarten
on 2024/02/26 12:25
on 2024/02/26 12:25
Change comment:
There is no comment for this version
Summary
-
Page properties (4 modified, 0 added, 0 removed)
-
Attachments (0 modified, 1 added, 1 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,1 @@ 1 -[REAKT] WIPProjectREAKTOR1 +[REAKT] Projecting Irregular Vehicle Positions on Tracks - Parent
-
... ... @@ -1,1 +1,1 @@ 1 -Theses. Current Theses.WebHome1 +Theses.Topics for Student Theses.WebHome - Syntax
-
... ... @@ -1,1 +1,1 @@ 1 - XWiki2.11 +markdown+github 1.0 - Content
-
... ... @@ -1,30 +1,38 @@ 1 -The REAKT project (https://reakt.sh/ & https://www.schiene-m-l.de/)aims atdevelopingnewmobilityconceptstoreactivateruralrail lines. This projectwillevolvearound developingan autonomouson-demand rail vehicleaber to flexiblyprovideserviceon single tracklines.Aprototypewillbebuildin1:32 scaleaswellasafullscale version.1 +The REAKT DATA project (<https://reakt.sh/>) includes visualizing rail vehicle positions on the track based on a set of position data from GNNS trackers. These position data are sparse and include errors and variation, yet it can be safely assumed that the rail vehicle will not leave the track in normal operation. Hence, this topic will investigate an algorithm to process the data and project the position of the vehicles onto the track. 2 2 3 - ==Overviewof topics(WIP) ==3 +# Goals 4 4 5 -1. A digital twin for an autonomous on-demand train service 6 -2. An autonomous train controller with risk analysis using STPA 7 -3. A digital twin for an autonomous on-demand train service 8 -4. AI-based image recognition for autonomous train control [in cooperation with AG Distributed Systems] 9 -5. AI-based sensor processing for autonomous train control [in cooperation with AG Distributed Systems] 5 +* Develop and implement an algorithm for computing a best-effort projection of a vehicle position on a track 6 +* Evaluate the algorithm (and potential variants of the algorithm) with the real-world data collected on the Malente-Lütjenburg track 10 10 11 - ==Goals==8 +#### Consiterations for the Algorithm 12 12 13 -* TBA for each topic individually 10 +* Errors in GNNS data 11 +* Gaps in GNNS data (missing network) 12 +* Different accuracy of tracking devices (Smartphones vs. dedicated Trackers) 13 +* Showing estimates of expected movement or potential location areas 14 +* Handling inconsistencies 15 + * Unrealistic position jumps 16 + * Passing other vehicles (quickly) on single-lane track 17 + * Vehicles changing direction without stopping 14 14 15 - ==Scope==19 +# Scope 16 16 17 17 Bachelor's Thesis 18 18 19 - ==Related Work/Literature==23 +# Related Work/Literature 20 20 21 -* https://reakt.sh/25 +* 22 22 23 - == Involved Languages/Technologies==27 +[https://reakt.sh/](https://reakt.sh/) * 24 24 25 - * TBA foreachtopicvidually29 +[https://github.com/kieler/RailTrail/wiki/Data-processing#computation-of-vehicle-position-speed-and-heading](https://github.com/kieler/RailTrail/wiki/Data-processing#computation-of-vehicle-position-speed-and-heading) 26 26 27 - ==Supervisedby ==31 +# Involved Languages/Technologies 28 28 33 +* Python 34 + 35 +# Supervised by 36 + 29 29 Alexander Schulz-Rosengarten 30 -[[als@informatik.uni-kiel.de >>mailto:als@informatik.uni-kiel.de]]38 +[[als@informatik.uni-kiel.de|path:mailto:als@informatik.uni-kiel.de]]
- position.png
-
- Author
-
... ... @@ -1,1 +1,0 @@ 1 -XWiki.als - Size
-
... ... @@ -1,1 +1,0 @@ 1 -394.7 KB - Content
- image-20240226113213-1.png
-
- Author
-
... ... @@ -1,0 +1,1 @@ 1 +XWiki.als - Size
-
... ... @@ -1,0 +1,1 @@ 1 +394.7 KB - Content