headline_ifi.png

RailwayProject.png

This project is offered as bachelor project as well as master projecthttp://univis.uni-kiel.de/form?__s=2&dsc=anew/lecture_view&lvs=techn/infor/inform/echtze/prakte&anonymous=1&founds=techn/infor/inform/echtze/prakte&sem=2014s&__e=100

Welcome!

Welcome to the Confluence Wiki of the Railway Project. What this Wiki is all about:

  • It's the place where we post important information on the project, such as due dates and similar information.
  • It's also the place where we post tutorials. You will spend the first part of the project working through the tutorials before starting your individual projects.
  • And finally, it's the place where each group will document their project.

About the Railway Project

This project employs model-based-design and the synchronous approach to control a Model Railway. The application is a local physical existent model railway installation where multiple trains shall be driven concurrently on the installation. Development of this project is done in a model-based-design, using SCCharts, which merges control flow (Statecharts) and data flow.

This project is done in a practical laboratory course at the Christian-Albrechts University of Kiel in the Department of Computer Science within the Real-Time and Embedded Systems Group.

railway12.jpg

Contact us:

The project is supervised by the following university staff. Please contact us if you have questions regarding the project.

  • Prof. Dr. Reinhard von Hanxleden (rvh@informatik...)
  • M.Sc. Alexander Schulz-Rosengarten (als@informatik...)
  • Dipl.-Inf. Steven Smyth (ssm@informatik...)
  • M.Sc. Nis Wechselberg (nbw@informatik...)

Important Dates

Datum

Raum

Termin

06.02.17
11:45 Uhr

LMS 2 - R. Ü1

Introduction

11.04.17
12:15 Uhr

R1114/1115

CAP4

Kick-Off Meeting

Tags: