railwayheader1b.pngheadline_ifi.png

This project is offered as Inf-AP-ES: Abschlussprojekt - Echtzeitsysteme/Eingebettete Systeme and as MSP1101: Masterprojekt - Echtzeitsysteme/Eingebettete Systeme (Modellbahn)

Welcome!

Welcome to the Confluence Wiki of the Railway Project. What this Wiki is all about:

  • It's the place where we post important information on the project, such as due dates and similar information.
  • It's also the place where we post tutorials. You will spend the first part of the project working through the tutorials before starting your individual projects.
  • And finally, it's the place where each group will document their project.

About the Railway Project

This project employs model-based-design and the synchronous approach to control a Model Railway. The application is a local physical existent model railway installation where multiple trains shall be driven concurrently on the installation. Development of this project is done in a model-based-design, most likely SCCharts or alternatively the SCADE Suite, which merges control flow (Statecharts) and data flow.

This project is done in a practical laboratory course at the Christian-Albrechts University of Kiel in the Department of Computer Science within the Real-Time and Embedded Systems Group.

railway12.jpg

Important Dates

Datum

Raum

Termin

Do, 30.01.

13:50 - 14:10

R1114/1115

CAP4

Vorbesprechung

Di, 15.04.

13:50 - 14:10

R1114/1115

CAP4

Vorbesprechung

Tags: